Technical Specifications
| Model | MLF-4 / MLF-8 / MLF-16 |
| Number of Lines | 4 / 8 / 16 lines |
| Load Capacity per Line | Up to 500 kg |
| System Speed | 0.1 – 0.5 m/s (programmable) |
| Positioning Accuracy | ±2 mm |
| Control Interface | Touchscreen with joystick control |
| Software | Proprietary flying control software |
| Communication | Ethernet, CANopen, or proprietary |
| Safety Features | Load monitoring, slack detection, emergency stop |
| Power Supply | 380V / 50Hz / 3-Phase (main) |
| Protection Class | IP54 (control room) / IP43 (field equipment) |
| Weight | System dependent on configuration |
Applications
Large Theatre Productions – Complex flying effects for professional theatre productions.
Opera Productions – Sophisticated flying systems for opera stage requirements.
Theme Park Shows – Automated flying effects for theme park attractions.
Concert Productions – Multi-line flying for concert staging and effects.
TV Studio Productions – Automated flying for television studio productions.
Performer Flying Applications – Safe, controlled flying for performer movements.
Key Advantages
Multi-Line Coordination – Synchronized control of multiple flying lines for complex effects.
Advanced Control Software – User-friendly interface for programming and operation.
Comprehensive Safety – Multiple safety features including load monitoring and slack detection.
Scalable Configuration – Systems can be expanded from 4 to 16 lines.
Real-Time Monitoring – Continuous monitoring of all system parameters and line positions.
Integration Capable – Can be integrated with other stage systems for complete show control.
Payment & Shipping
Payment Terms: Project-specific terms.
Lead Time: 8–16 weeks depending on configuration.
Packaging: Project-specific crating and logistics.
Shipping: FOB Shanghai.
Installation Support: On-site installation and commissioning included.
Warranty: 24 months standard with extended options available.
Frequently Asked Questions
Q: What is the maximum load capacity per line?
A: Standard systems provide up to 500kg per line. Higher capacity configurations are available for specific requirements.
Q: Can the system be used for performer flying?
A: Yes, when specified with performer flying safety features and redundant safety systems, the system is suitable for performer flying applications.
Q: What training is required for operation?
A: We provide comprehensive operator training including software operation, safety procedures, and emergency protocols. Training duration is typically 3-5 days.














